PUCs and PSCs are unbiased regulatory agencies appointed through the point out legislature. Turbines can only be designed with approval within the PUC or PSC, and these agencies established suitable electrical power costs within their condition that the utilities should abide by [2]. If anything at all, an overly costly amp or supply will pres